He required land-use reasons tied to the particular proposal
He required a factual connection between the rule or concern invoked and the particular application. Proposed improvements, reduced dimensions and comparable approvals could expose that missing connection. A board’s repeated assertion of harm did not substitute for explaining why this project caused it or why a different result from similar applications was justified.
Preparation point
Connect the particular proposal to the statutory criteria and the agency’s stated reasons.
How it played outSituation, action, outcome
- The situation
- Agencies denied or added review requirements for particular projects.
- What he did
- Justice Modelewski directed approvals where a smaller addition and better sewage treatment lacked an explained environmental harm, and where a smaller variance was denied without accounting for comparable approvals. After trial, he also annulled an unexplained demand for a building-related variance on an outdoor battery installation.
- What made a difference
- The battery-storage dispute included a trial at which officials could not explain why an outdoor installation with no building required the asserted building variance.
In his words2 quotes
“utterly failing to particularize how and why”
Brittis v Zoning Bd. of Appeals of the Town of E. Hampton, *2. He criticized the missing connection to environmental harm.
“So you are saying no building is like a smaller building”
Holtsville Energy Stor., LLC v Suffolk County, *2. His question to the County engineer at the Holtsville trial.
In the cited cases3 rulings
Brittis’s smaller addition kept the existing footprint and improved sewage treatment. Justice Modelewski found no explanation connecting it to environmental harm and directed approval.
Meadow Lane sought much less dimensional relief than comparable prior approvals. Justice Modelewski found the denial unexplained and ordered the variances granted.
Holtsville officials could not explain why an outdoor battery-storage installation needed an Article 7 variance. Justice Modelewski rejected their construction equating no building with a small building and annulled the determination.